The heating training facility in Maribor is designed on three floors (K+P+1). In the basement part of the hall there are 8 60 m running tracks, a long jump track and a fitness room with a small storage room. The ground floor of the building is functionally divided into three parts, connected by a corridor. In the central part of the building there is the main public entrance to the building with an entrance hall where there is also a TIC - Tourist Information Centre. To the left, along the corridor, is the administrative - management part of the facility, the doping control rooms with their own toilets, the rooms for delegates at competitions, toilets, technical room and a separate exit to the competition area. To the right are the rooms reserved for athletes or other participants in the competitions. The tribune part of the building contains a VIP area with separate toilets and a terrace, referee and commentator booths and men's and women's public toilets. The athletics stadium can accommodate 976 spectators.

System ociepleń Baumit

Materiały Baumit

Architekt

Lab Arhitekti d.o.o.

Lokalizacja

Maribor

Kategoria

Budynki niemieszklane nowe